Industrial refinery at twilight

INDUSTRIES

Built for chemical sites, and for anywhere else the work is high-risk.

Built for chemical sites, and for anywhere else the work is high-risk.

Built for chemical sites, and for anywhere else the work is high-risk.

AdvantageEHS was designed inside the European chemical sector, where the regulatory bar sits highest. Everything it enforces there carries over to any floor that runs permits, isolations and contractors.

AdvantageEHS was designed inside the European chemical sector, where the regulatory bar sits highest. Everything it enforces there carries over to any floor that runs permits, isolations and contractors.

AdvantageEHS was designed inside the European chemical sector, where the regulatory bar sits highest. Everything it enforces there carries over to any floor that runs permits, isolations and contractors.

THE CORE INDUSTRY

Chemical has the strictest rulebook in Europe, and we built to it for everyone.

Chemical has the strictest rulebook in Europe, and we built to it for everyone.

Chemical has the strictest rulebook in Europe, and we built to it for everyone.

That was a constraint we picked deliberately, and it shaped everything underneath. You get the result of it whether or not those directives apply to your site.

That was a constraint we picked deliberately, and it shaped everything underneath. You get the result of it whether or not those directives apply to your site.

That was a constraint we picked deliberately, and it shaped everything underneath. You get the result of it whether or not those directives apply to your site.

There were shortcuts we could not take.

There were shortcuts we could not take.

There were shortcuts we could not take.

A Seveso inspector does not just look at your equipment, they look at whether your management system actually works in practice. That ruled a lot of things out. A hazard could not be a line of text in a form, it needed an owner and a review date. An isolation could not be a tickbox, it had to genuinely stop the permit from opening.

None of that is specific to chemicals. A machine shop will never be audited to Seveso standard, but the accident is identical: somebody works on equipment that turned out to be live. That is why the same system covers the other five sectors on this page without being cut back for any of them.

Seveso

CAD directive

Containment

Works council ready

Heavy manufacturing
Shop floor
Hot work and confined space permits
Four energy source types mapped
Contractor access on the same system
Same interlock, shop floor vocabulary
EST. IN CHEMICAL

WHERE WE OPERATE

Six sectors with the same compliance core.

Six sectors with the same compliance core.

Six sectors with the same compliance core.

The same interlock between register, permit and isolation underneath all of them. What changes is the vocabulary on the form and the shape of the hazards, not the system.

The same interlock between register, permit and isolation underneath all of them. What changes is the vocabulary on the form and the shape of the hazards, not the system.

The same interlock between register, permit and isolation underneath all of them. What changes is the vocabulary on the form and the shape of the hazards, not the system.

Manufacturing

Heavy manufacturing

Heavy manufacturing

Secure heavy machinery with precise isolation sequencing. Manage external contractors and simultaneous shop-floor work with a live view of every permit on site.

Secure heavy machinery with precise isolation sequencing. Manage external contractors and simultaneous shop-floor work with a live view of every permit on site.

Secure heavy machinery with precise isolation sequencing. Manage external contractors and simultaneous shop-floor work with a live view of every permit on site.

Utilities

Power and utilities

Power and utilities

Keep control of isolated electrical and mechanical energy sources across distributed sites, with a lock registry that says which asset, which operator and when.

Keep control of isolated electrical and mechanical energy sources across distributed sites, with a lock registry that says which asset, which operator and when.

Keep control of isolated electrical and mechanical energy sources across distributed sites, with a lock registry that says which asset, which operator and when.

Energy

Oil and gas

Oil and gas

Run high-consequence work against a register that updates as conditions change, rather than one that was accurate the last time somebody reviewed it.

Run high-consequence work against a register that updates as conditions change, rather than one that was accurate the last time somebody reviewed it.

Run high-consequence work against a register that updates as conditions change, rather than one that was accurate the last time somebody reviewed it.

Logistics

Logistics and terminals

Logistics and terminals

High traffic, many contractors, restricted zones. Standardise risk assessments and entry permits for loading areas and hazardous storage, so a driver who has never been on site follows the same procedure as the person who has been there fifteen years.

High traffic, many contractors, restricted zones. Standardise risk assessments and entry permits for loading areas and hazardous storage, so a driver who has never been on site follows the same procedure as the person who has been there fifteen years.

CONSTRUCTION

Construction

Construction

Issue, suspend and close daily work permits for dozens of rotating sub-contractors from one place, with the authorisation trail intact when the job moves on.

Issue, suspend and close daily work permits for dozens of rotating sub-contractors from one place, with the authorisation trail intact when the job moves on.

PHARMACEUTICALS

Pharmaceuticals

Pharmaceuticals

Maintenance and high-risk intervention in cleanrooms and sterile environments, with the documentation regulators expect available in seconds rather than assembled afterwards.

Maintenance and high-risk intervention in cleanrooms and sterile environments, with the documentation regulators expect available in seconds rather than assembled afterwards.

WHAT THEY HAVE IN COMMON

The same things go wrong in very different places.

The same things go wrong in very different places.

The same things go wrong in very different places.

Whether you’re refining crude or moulding automotive parts, the same problems come up, which is why one system covers all six sectors without being watered down for any of them.

Records that do not talk to each other

Records that do not talk to each other

Records that do not talk to each other

The risk assessment lives in one place, the permit in another, the isolation plan in a third. Each one is correct on its own, and they can drift apart without anybody noticing.

The risk assessment lives in one place, the permit in another, the isolation plan in a third. Each one is correct on its own, and they can drift apart without anybody noticing.

YOUR SYSTEM

Contractors on your site, outside your system

Contractors on your site, outside your system

Contractors on your site, outside your system

The people doing your highest-risk work often have the least access to your procedures. They arrive, they work, and your records catch up afterwards if they catch up at all.

The people doing your highest-risk work often have the least access to your procedures. They arrive, they work, and your records catch up afterwards if they catch up at all.

The people doing your highest-risk work often have the least access to your procedures. They arrive, they work, and your records catch up afterwards if they catch up at all.

Audit preparation from a standing start

Audit preparation from a standing start

Audit preparation from a standing start

Weeks spent assembling evidence that already exists, because it exists in six places and none of them are joined up. The work was done properly. Proving it is the expensive part.

Weeks spent assembling evidence that already exists, because it exists in six places and none of them are joined up. The work was done properly. Proving it is the expensive part.

Weeks spent assembling evidence that already exists, because it exists in six places and none of them are joined up. The work was done properly. Proving it is the expensive part.

These are consequences of running three separate tools, which is why the fix is the same on a refinery and a loading dock.

Whichever floor you run, the first twenty-five minutes are the same.

Whichever floor you run, the first twenty-five minutes are the same.

Whichever floor you run, the first twenty-five minutes are the same.

One call, the real product, one job walked end to end. We will use a scenario from your sector rather than a generic one.

One call, the real product, one job walked end to end. We will use a scenario from your sector rather than a generic one.

One call, the real product, one job walked end to end. We will use a scenario from your sector rather than a generic one.

Book a 25-minute demo →

Early adopter pricing is open to the first five sites.